A deviation, waiver, or concession can authorize a bounded departure from a released requirement. It is not a way to erase a nonconformance, revise a drawing informally, or ship first and ask later. The request must describe the exact condition, affected product, technical risk, evidence, containment, and duration so the authorized design or customer function can decide.
This CNC deviation concession request guide explains terminology, required data, engineering evaluation, approval boundaries, traceability, shipment controls, and corrective action. Customer procedures and contract definitions take precedence because organizations use these terms differently.
Clarify the Terms
“Deviation” often refers to permission before producing or shipping product that will differ from a requirement. “Waiver” or “concession” often refers to authorization to use or release already nonconforming product. Some customers reverse or combine the terms.
Use the customer’s form and definition. More important than the label are timing, authority, scope, and documented disposition.
Never Treat Silence as Approval
A request sent by email or portal is pending until an authorized approval is recorded. Production or shipment during review may create unauthorized product and commercial risk. Define whether work may continue at risk and who accepts that risk.
Procurement urgency does not give a supplier permission to change design. Planning systems should block shipment when required approval is open.
Identify the Requirement Exactly
State part number, revision, drawing or model characteristic, balloon or zone, specification, note, purchase-order clause, nominal and limits, units, and final process state. Attach a marked image when it helps locate the feature, but retain the controlled source.
Avoid “dimension slightly out” or “finish acceptable.” The approver must see the requirement without reconstructing it.
State the Actual Condition
Report measured values, range, distribution, sample size, method, uncertainty where relevant, and which serials or lots were checked. For appearance, provide controlled photographs and the applicable visual standard. For missing documentation, identify what evidence exists and what cannot be recovered.
Do not report only the worst or an average when individual acceptance matters. Preserve original results, including retests.
Define the Affected Population
List purchase order, work order, lot, serial range, quantity produced, quantity inspected, quantity affected, quantity shipped, and remaining work in process. If the boundary is uncertain, use conservative containment until traceability establishes it.
One approval should not silently cover parts from different revisions, materials, processes, or orders.
Contain Before Evaluating
Stop or control the process, identify and segregate affected product, protect evidence, and prevent unauthorized shipment. Determine the last known conforming point and inspect inventory, work in process, sub-tier stock, and transit as appropriate.
Containment is temporary risk control, not root-cause correction. Record who owns it and the exit criteria.
Describe How the Issue Was Found
State whether the condition was discovered during in-process inspection, final inspection, FAI, customer receiving, assembly, test, audit, or document review. Detection point helps assess escaped population and control-system weakness.
Explain the measurement or observation method and why earlier controls did not detect it. Avoid speculative root cause at the request stage unless evidence supports it.
Evaluate Function, Not Only Numerical Distance
A dimension 0.01 mm outside tolerance may be harmless or critical depending on fit, load, sealing, alignment, fatigue, surface treatment, and stack-up. Engineering should review the actual function and interactions rather than treating percent over tolerance as risk.
Use analysis, assembly trials, test, mating-part data, finite-element work, tolerance analysis, or subject-matter review as appropriate. Identify assumptions and margins.
Review Interchangeability
Determine whether the affected part mates with all allowed counterparts or only selected units. A concession that relies on selective assembly changes logistics, spares, service, and field interchangeability. Document matched serials and prevent separation if approved.
Consider future replacement. A part that works in today’s assembly may fail when serviced with nominal hardware.
Review Downstream Processes
An out-of-tolerance feature may change anodize thickness, plating fit, heat-treatment distortion, grinding stock, coating mask, assembly force, sealing, cleaning, or inspection access. A cosmetic issue may become more visible after finish.
Map every remaining operation and obtain sub-tier input where needed. Approval before final processing should say whether the disposition remains valid afterward.
Assess Safety and Regulatory Impact
Safety, regulatory, flight, medical, pressure, lifting, or other controlled applications may restrict concession authority or require additional analysis and customer/regulator approval. Identify special characteristics and compliance evidence.
Do not use a commercial schedule argument as technical justification. If required evidence is missing, state that uncertainty.
Assess Material and Traceability Issues
A wrong alloy, heat treatment, product form, source, or lost heat identity may not be recoverable by dimensional inspection. PMI can support some alloy questions but may not establish all elements, mechanical properties, or processing history.
Material concessions need qualified materials and design review. Never fabricate or alter a certificate to support disposition.
Assess GD&T Nonconformance
For position, profile, runout, or orientation, report the datum setup, actual result, feature size, bonus tolerance, and measurement method. A different best-fit alignment can change the number but may not represent assembly.
Engineering should review the mating boundary and tolerance stack. If an alternate method is proposed, explain why it is technically valid under the drawing standard.
Assess Surface and Cosmetic Conditions
Scratches, dents, tool marks, color variation, texture, burrs, and edge conditions need location, size, depth, quantity, and visual context. State whether the area is cosmetic, sealing, fatigue-critical, electrical, cleanroom, or hidden after assembly.
Use an approved visual standard and lighting. Touch-up may create a new process or appearance risk requiring separate approval.
Propose a Specific Disposition
Common dispositions include use-as-is, rework to drawing, repair to an approved instruction, return, scrap, or sort/select. The request should propose one action and explain evidence. “Please accept” without a technical plan creates unnecessary review cycles.
Rework returns the item to the original requirement; repair changes it to an acceptable condition under authorized instruction. Keep the distinction clear.
Rework Plan
Define operation, setup, datum, tool, maximum material removal, intermediate checks, final inspection, finish restoration, marking, and responsible personnel. Verify remaining wall, heat treatment, coating, and feature relationships.
Repeated unplanned cuts can create new nonconformances. Obtain approval before irreversible work when the customer procedure requires it.
Repair Plan
A repair may add material, bush a hole, blend damage, install an insert, locally finish, or alter geometry. It needs engineering instructions, process qualification, limits, inspection, and configuration traceability.
The repaired state may affect maintenance or life. Mark and retain records where required. Do not describe repair as ordinary rework to avoid approval.
Temporary Versus Permanent Change
A concession is normally bounded. If the condition is acceptable for all future product, incorporate it through formal design change, specification change, or alternate requirement. Continuing to request the same concession indicates the baseline or process has not been resolved.
Approval should state that it does not revise the design unless the customer explicitly issues a change.
Approval Boundaries
Every authorization should identify part and revision, purchase order or program, serial/lot/quantity, characteristic, actual condition, disposition, required actions, effective and expiration dates, and approvers. Conditions such as special labeling, selective assembly, price adjustment, or extra inspection must be included.
If any field changes, obtain revised approval. Do not expand scope verbally.
Authority and Signatures
Only designated roles can accept design risk. Supplier quality may prepare a request, but customer design authority, MRB, regulatory, or program functions may need to approve. Buyer or receiving personnel may not have engineering authority.
Validate electronic signatures and portal status. Record delegation and approval date.
Marking and Shipment Identification
Approved product may require special labels, tags, packing-list notes, certificate references, serial marking, or separate packaging. This allows receiving and assembly to apply conditions. The mark must not damage the part or conflict with drawing marking.
Include a copy or reference to the approval with shipping documents as required. Reconcile shipped quantity against authorization.
ERP and Traveler Controls
Enter the concession number, affected quantity, status, and expiration in planning and quality systems. The work traveler should show containment, rework/repair, final inspection, and release signature. Prevent operators from using an old approval on a new lot.
For partial shipment, decrement the authorized balance. Close the record when quantity or date expires.
Supplier and Sub-Tier Requests
When an anodizer, heat treater, material supplier, or other sub-tier reports nonconformance, the machining supplier must evaluate and transmit it through the correct customer channel. Do not let the sub-tier contact replace tier-one accountability.
Preserve sub-tier records and actual data. Flow down the final disposition and required rework controls.
Cost and Schedule Disclosure
State the impact of hold, sort, rework, replacement, or scrap and the latest date a decision is needed to protect delivery. This helps prioritization, but it must remain separate from technical risk.
Do not manipulate analysis to support the lowest-cost outcome. Present viable options with cost, lead time, and residual risk.
Root Cause and Corrective Action
Approval of product disposition does not close the process issue. Determine why the condition occurred and escaped, implement correction and corrective action, verify effectiveness, and update PFMEA, control plan, program, fixture, gage, or training as needed.
The customer may require an 8D or other format. Keep the concession number linked to the corrective-action record.
Recurrence Tracking
Trend concessions by part, characteristic, cause, machine, supplier, and customer. Repeated requests can show an unrealistic requirement, unstable process, worn fixture, poor change control, or inadequate inspection.
Set escalation thresholds. A part accepted once is not evidence that recurrence is harmless.
Build a Technical Risk Assessment
Organize the assessment by function and failure mode. For each affected characteristic, identify the mating interface or requirement, credible failure, severity, actual margin, supporting calculation or test, uncertainty, and residual risk after the proposed disposition. Cite the controlled source for every input.
A tolerance-stack result should include mating-part limits, datum mobility, thermal or coating effects, and assembly sequence. A structural calculation should identify load cases, material allowables, geometry, safety factor, and reviewer. A fit trial should record actual part and mate serials, measurements, procedure, and acceptance; one successful assembly does not prove interchangeability.
State what was not evaluated. Decision-makers need visible uncertainty rather than an overly confident conclusion.
Use Representative Tests Carefully
Testing can support disposition when the sample, method, and acceptance represent the affected population. Choose worst-case or statistically justified parts, control equipment and environment, and retain raw results. Destructive tests need explicit sample disposition and links to the lot.
Passing a test does not automatically waive a drawing requirement. Engineering must determine whether the test directly covers the failure mode and whether it protects service life. If the request relies on accelerated or surrogate testing, explain the correlation and limitations.
Do not test until something passes and omit failed trials. Preserve the full sequence and approved protocol.
Measurement Confirmation Before Submission
Confirm that the apparent nonconformance is real. Review calibration, resolution, uncertainty, fixturing, datum simulation, temperature, cleanliness, sampling, software, and operator technique. Remeasure under the approved method when evidence suggests a method problem, while retaining the original result.
If supplier and customer methods disagree, exchange raw data and setups and measure common artifacts or parts. Do not choose a different alignment only because it returns a passing number. An approved method correction may show that product conforms; that conclusion needs documented technical basis, not a concession.
Define the final value set that appears in the request and explain excluded or superseded readings.
Multi-Characteristic and Compound Conditions
Several individually small departures can interact. An oversize hole plus position error, a bowed flange plus rough sealing surface, or thin coating plus base-metal scratch may create a combined risk larger than either alone. List every known nonconformance on the same affected unit.
The assessment should not use full design margin twice. If one analysis consumes assembly clearance and another assumes the same clearance is available, combine them in a single stack or model. Look for correlated causes, such as fixture movement that shifts several features together.
Approval should cover the complete described condition. Discovery of another departure returns the part to hold until impact is reassessed.
Language That Avoids Ambiguity
Use measurable statements: “Hole H7 measured 10.018–10.021 mm after anodize on serials 101–108” rather than “holes slightly large.” Say “use as is for PO 456, quantity 8, expires 31 December” instead of “acceptable.” Identify drawing callout and report reference.
Avoid unsupported adjectives such as negligible, cosmetic only, no impact, or industry standard. Replace each with the evidence and decision authority. Separate facts, engineering assumptions, commercial impact, and recommendation.
If customer terminology distinguishes request, deviation, concession, and waiver, use it consistently in file names, portal entries, labels, and shipment records.
Approval Conditions Must Reach Production
An approval can require selective mating, restricted orientation, additional inspection, rework, labeling, special packaging, reduced life, or use in one build. Translate each condition into the traveler, assembly instruction, inspection plan, ERP hold, and shipping documents before release.
Brief the responsible operators and verify completion. If a condition cannot be implemented or audited, return to the approver instead of improvising. Record actual mating serials, rework results, or labels as required.
At shipment review, compare quantity, serials, dates, and conditions with the authorization. An approved eight-piece lot does not permit shipping a ninth replacement.
Customer-Owned Design Versus Supplier-Owned Design
For build-to-print parts, the customer design authority normally decides whether a departure is acceptable. The supplier provides accurate data, process knowledge, and a recommendation but cannot change the design baseline. For supplier-designed products, internal engineering may have disposition authority subject to customer and regulatory rules.
Contract review should identify authority before the first issue. Joint designs and approved vendor drawings can split responsibility by characteristic. Route the request to every required owner rather than assuming purchasing approval covers design.
Protect proprietary information while giving approvers enough geometry, loads, interfaces, and evidence to decide.
Preserve Configuration History
Index the approved request by part, revision, serial or lot, order, characteristic, and disposition. Link it to nonconformance, inspection, rework or repair, corrective action, and shipment. Retain the version actually approved; a later edited form should not overwrite it.
When the drawing changes, assess whether open requests are superseded, incorporated, or still applicable to previously built product. Do not apply an approval written against Revision B to Revision C without authorization.
Long-life products may need the concession record during maintenance or failure investigation. Use retention and digital migration rules consistent with the product program.
Commercial Resolution Is Separate
The parties may negotiate price credit, replacement, schedule, or warranty after technical disposition. Keep those terms linked but separate from engineering acceptance. A discount cannot make a nonconforming safety requirement acceptable, and a technically acceptable concession does not decide who bears cost.
Record whether approval preserves warranty, limits use, or requires future replacement. Procurement should not pressure technical approvers by embedding commercial commitment inside the risk conclusion.
For urgent shortages, present multiple options—use with evidence, controlled rework, replacement, or build reschedule—so the buyer can evaluate time and cost after technical boundaries are clear.
A Request Data Table
| Section | Required content | Common failure |
|---|---|---|
| Configuration | Part, revision, PO, drawing/model | Wrong baseline |
| Requirement | Characteristic and exact limits | Vague description |
| Actual | Individual values, method, units | Average only |
| Population | Lot/serial/quantity and containment | Unknown scope |
| Risk | Fit, function, safety, downstream impact | “Minor” without analysis |
| Proposal | Use, rework, repair, sort, or scrap | No specific disposition |
| Boundaries | Quantity, date, conditions, approvals | Reused indefinitely |
| Prevention | Root cause and action plan | Disposition treated as closure |
Example: Oversize Hole
Suppose a dowel hole is 0.012 mm above its upper size limit on eight serialized housings. The request should report each measured size, roundness or form relevant to fit, position, method, uncertainty, material and coating state, mating dowel limits, required interference or clearance, and assembly loads.
Engineering might evaluate a controlled larger dowel, approved bushing repair, selective assembly, or scrap. Approval must identify which housings and mating parts, installation instruction, verification, and service implications. It cannot become permission to widen every future hole.
Example: Cosmetic Anodize Variation
A color difference may meet coating thickness and corrosion requirements but fail the approved appearance standard. The request should define zone, lighting, reference panel, affected quantity, processor lot, photographs, and whether parts will be visible together.
Customer acceptance may be bounded to a prototype build or hidden location. Corrective action may address alloy heat mixing, rack position, pretreatment, or lot segregation.
When to Reject the Request Internally
Do not forward a request that lacks traceable population, credible measurement, technical assessment, proposed disposition, or authorization route. Stop when the condition affects an unassessed safety/regulatory requirement or when the product has already been altered without approval.
Completing the evidence first gives the customer a decision-ready package and reduces turnaround.
Buyer Questions
- Is the request pre-production or for existing nonconforming product?
- What exact requirement and baseline apply?
- What are all actual values and how were they measured?
- Which lots, serials, quantities, and locations are contained?
- What fit, function, safety, and downstream effects were assessed?
- What disposition and verification are proposed?
- Who has authority to approve the risk?
- How will approved units be marked and shipped?
- What prevents reuse after quantity or date expires?
- What root cause and corrective action prevent recurrence?
Request Checklist
- Stop, identify, segregate, and preserve affected product.
- Freeze the correct part, revision, drawing, model, and PO baseline.
- State exact requirement, actual values, units, and method.
- Bound all affected and potentially affected quantities.
- Analyze function, stack-up, safety, material, and downstream processes.
- Propose use, rework, repair, sort, return, or scrap explicitly.
- Define serial/lot, quantity, date, and condition limits.
- Obtain authorized approval before shipment or irreversible work.
- Mark product and shipping records as required.
- Track approval balance and expiration in controlled systems.
- Complete root cause, corrective action, and effectiveness review.
- Convert recurring acceptable conditions into formal design change.
The Practical Disposition Decision
A strong request makes a narrow engineering decision possible without hiding uncertainty. It identifies what differs, how much, which product, why it matters, how it will be controlled, and what prevents recurrence. Approval is a bounded risk decision, not a revised drawing.
For support documenting a CNC nonconformance before customer review, provide the controlled design, actual measurement data, traceable population, process state, mating information, and proposed disposition through Request a Quote.