An aerospace first article inspection is a documented verification that a representative item made by the planned production process accounts for the applicable design characteristics. It is not simply a dimensional report and it is not approval of future nonconforming product. The package connects configuration, material, manufacturing processes, inspection results, and open issues at a defined baseline.
This AS9102 FAIR CNC machining guide explains planning, Forms 1–3, ballooning, full and partial FAI, supplier flow-down, digital records, and buyer review. Use the revision of AS9102 and customer requirements invoked by the contract; obtain the licensed standard and required forms rather than treating an online summary as the acceptance authority.
FAI Versus First-Piece Inspection
A machinist may inspect the first piece from a setup to adjust tools and confirm the operation. That first-piece check is process control. A formal first article inspection (FAI) covers design-characteristic accountability and supporting records for the defined item and production realization process.
One part can serve both purposes, but the records and approval are different. Do not label an informal setup sheet an AS9102 package.
FAI Versus Routine Final Inspection
Routine final inspection follows the production control plan at the required sample or frequency. FAI is usually performed at initial production and at specified change or lapse triggers to validate the baseline. Passing FAI does not eliminate ongoing inspection, and routine conformance does not automatically satisfy FAI documentation.
The purchase order should identify which activities and submissions are required for each stage.
FAI Planning Starts at Contract Review
Before machining, review part number, revision, drawing, model, specifications, purchase-order clauses, customer portals, source inspection, delegated approvals, and due dates. Determine whether the item is detail, subassembly, assembly, or software-controlled configuration and which requirements apply.
Identify a responsible FAI owner. Waiting until shipment to assemble records commonly reveals missing material certificates, unapproved processors, unmeasured characteristics, or a form revision the customer will not accept.
Select a Representative First Article
The item should be produced using the intended production process, tooling, machines or approved equipment class, programs, personnel qualification, material, and sub-tier sources. A hand-worked prototype made by an exceptional route may not represent production.
Record serial or lot identity and preserve links to travelers and inspection data. If multiple parts contribute results, the contract and standard must permit the approach and the package must show which result belongs to which item.
Full and Partial FAI
A full FAI accounts for the complete current design baseline. A partial FAI addresses affected characteristics after a qualifying change while preserving reference to an approved baseline. The organization determines and documents the reason, scope, and unchanged characteristics according to the invoked standard and customer rules.
“Partial” does not mean measuring an arbitrary sample of dimensions. It is a change-impact decision supported by configuration and process knowledge.
Typical FAI Triggers
Triggers can include a new part, design change, manufacturing source change, process or method change, tooling change, machine relocation, numerical-control program change, lapse in production, natural or human event affecting the process, or customer requirement. Exact criteria and lapse periods must follow the invoked revision and contract.
Create a trigger checklist in change control. Do not rely on memory after production has moved.
Form 1: Part Number Accountability
Form 1 identifies the article and assembly relationship. It records items such as part number, name, serial or lot, FAI report number, revision, drawing number and revision, organization, purchase order, and whether the FAI is full or partial. Assembly FAI can reference lower-level detail FAIRs.
The configuration on Form 1 must agree with the physical part, traveler, drawing, model, and customer order. Explain partial-FAI reason and baseline reference clearly.
Form 2: Product Accountability
Form 2 accounts for material, special processes, and functional testing. Entries typically identify the specification, code, supplier, certificate, approval status, and related report. This is where source material and outsourced anodizing, heat treatment, plating, passivation, NDT, welding, or testing connect to the article.
Attach or provide records as contractually required. Verify processor approval for the exact process and specification rather than only the supplier name.
Form 3: Characteristic Accountability
Form 3 lists every applicable design characteristic, its reference or balloon, requirement, result, inspection or test method where required, and nonconformance information. Dimensions, GD&T, notes, material calls, process notes, marking, and visual requirements all need disposition.
Record actual variable results when required. “Pass” or “conforms” may be appropriate for legitimate attribute characteristics, but it should not hide a measurable result that the form or customer requires.
Balloon the Entire Design Record
Ballooning assigns a unique characteristic number to each requirement and links it to Form 3. Include drawing views, tables, zones, flag notes, title-block requirements, general notes, specifications, digital product-definition annotations, and associated documents.
Avoid duplicate or missing balloons. Multi-place features may be one characteristic with multiple reported results or separate characteristics according to the reporting method. Make the mapping obvious to a reviewer who did not create it.
Model-Based Definition
When the 3D model contains product manufacturing information, the FAI plan must account for model annotations, saved views, associated files, and data-set revision. A 2D drawing may contain only supplemental notes and not the complete design.
Record the digital data identity and software or translation controls relevant to verification. Screenshots can support review but should not replace the controlled model.
Drawing and Model Precedence
The design authority should define which record controls when model and drawing differ. Suppliers must not choose the easier value. Raise a formal question before production, preserve the response, and ensure the corrected or authorized baseline is used throughout the FAIR.
The same precedence must govern CNC programming, inspection, and ballooning.
Capture Actual Results
For a dimensional tolerance, report the measured value or values with units and the associated requirement. For a pattern, include enough data to show each feature or approved summary. Material-condition bonus or datum mobility should be traceable to actual size and the evaluation method.
Do not round a failing result into a passing display. Retain instrument resolution and follow the agreed decision rule.
Multiple Occurrences
A note such as “6X” creates multiple occurrences. The report should make clear whether each was measured and how results map to locations. A single value without identification may not establish all six.
Use sub-characteristic notation, structured rows, or an attached report linked to the main balloon. Preserve failed and remeasured values according to record rules.
GD&T and Datums
Position, profile, runout, flatness, and orientation require the correct datum reference frame and governing standard. A CMM best fit is not a substitute for the drawing alignment. Record modifiers, actual size, bonus, and datum mobility where they affect acceptance.
Inspection-program revision and feature association matter for reproducibility. A numeric result without the intended datum construction can be misleading.
General Notes and Title-Block Requirements
Edge breaks, deburring, surface finish, marking, cleanliness, material, finish, workmanship, and specification notes are design characteristics even when they lack arrows. Determine how each is verified and document it.
Do not create meaningless numeric entries for attribute notes. State the objective evidence: visual standard, process certificate, marking check, cleanliness test, or traveler verification.
Material Evidence
Link the article to the material test report or certificate using heat, lot, batch, and stock identity. Verify grade, product form, condition, specification, chemistry or properties as required, and approved source. A certificate unrelated to the actual blank is not valid evidence.
Preserve traceability through cutting and machining. Record substitutions only after design/customer approval.
Special-Process Evidence
Some processes cannot be fully verified by later dimensional inspection. Heat treatment, welding, plating, coating, NDT, shot peening, and chemical processing may require approved sources, qualified procedures, personnel, and certificates.
Form 2 should identify the process specification and supplier. Review certificate part/revision, quantity, lot, process values or statement, approval, and dates. A processor’s quality certificate alone does not prove the lot received the required process.
Functional Testing
Leak, pressure, electrical, torque, flow, hardness, performance, or assembly tests may be design requirements. Define the procedure, equipment, units, acceptance, test article, and report identity. Connect results to Form 2 or Form 3 as required by the reporting scheme.
If testing is destructive, plan additional articles or coupons and preserve their relationship to the production lot.
Qualified Inspection Methods
Use equipment with suitable resolution, range, uncertainty, calibration, and access. Complex features may need CMM programming, functional gages, optical systems, profilometry, roundness equipment, or laboratory tests. First-article planning should identify methods before the part blocks access.
Record instrument or report references where required. Calibration status alone does not prove the method is capable.
Nonconformances
A first article with a nonconformance does not become conforming because the issue is written on the form. Identify the characteristic and nonconformance record, segregate product, and obtain authorized disposition. The package status must reflect unresolved issues.
After rework, record the new result and retain the history under the organization’s procedure. Use a partial or full FAI after corrective change when required.
Customer-Approved Deviations
A deviation or waiver applies only to its documented part, revision, quantity or serial range, characteristic, and time or order. Reference the authorization in the FAIR without modifying the drawing limit. Ensure the delivered item and records match the approval boundaries.
Temporary acceptance does not change future design requirements. Repeat orders need new authorization unless the approval explicitly covers them.
Lower-Level and Subassembly FAIRs
Assemblies may rely on FAIRs for detail parts and subassemblies. Form 1 provides accountability, but the assembly still needs characteristics created by assembly—orientation, torque, bonding, alignment, routing, marking, and functional test.
Review lower-level revisions and approval status. One changed detail may require only affected assembly characteristics or a broader partial FAI depending on impact.
Supplier Flow-Down
The machining supplier remains responsible for controlling outsourced processes and purchased components within its scope. Purchase orders to sub-tiers should flow down specifications, revision, approval, traceability, records, change notification, and right-of-access requirements.
Do not discover at FAIR review that a finishing vendor cannot provide the required certificate or is not customer-approved.
Digital FAIR Systems
eFAI tools can import balloons, link results, validate fields, and submit through portals. They do not decide whether a characteristic was correctly interpreted or whether the evidence applies. Control user permissions, templates, revisions, imports, and electronic approvals.
Keep the deliverable readable outside a proprietary system when the contract requires long retention. Archive source attachments and submission confirmation.
Common Rejection Reasons
- Wrong part, drawing, model, or form revision.
- Missing balloons for notes or title-block requirements.
- Form 3 rows without actual results where required.
- Incomplete multi-occurrence data.
- Material or process certificate not linked to the article.
- Unapproved special-process source.
- Wrong units, tolerance, or GD&T interpretation.
- Partial FAI without a documented trigger and baseline.
- Open nonconformance shown as accepted.
- Missing signatures, approvals, or customer portal fields.
An internal completeness review should catch these before customer submission.
Build a Characteristic Planning Matrix
Before production, expand the balloon list into a working matrix. For each characteristic record its design source, requirement, feature type, production operation, inspection method, instrument or program, sample article, responsible person, record output, and any customer witness or source-inspection gate. This exposes requirements that cannot be verified after later operations.
For example, a pocket floor may become inaccessible after assembly; a pre-coating thread must also meet final gaging; a weld joint needs visual or NDT evidence before paint; a material marking can disappear during machining. The matrix schedules evidence at the point it exists. Form 3 is then completed from controlled results rather than reconstructed from memory.
Use the matrix to distinguish characteristics verified by direct measurement from those supported by material, process, or functional certificates. One record can support multiple characteristics, but every row should state the link explicitly.
Key Characteristics and Process Controls
Customer-designated key characteristics may require controls beyond one-time FAI: process capability, control plans, measurement-system analysis, statistical monitoring, or source approval. Preserve the designation in balloons, travelers, inspection plans, and supplier flow-down.
Do not assume that a passing first article proves capability. FAI establishes design-accountability evidence for the representative article; ongoing controls address process variation. Conversely, a capable process does not excuse a missing FAIR characteristic or certificate.
If the supplier proposes a different control method, obtain authorized approval and update the controlled plan. Keep internal shop-critical features separate from customer key-characteristic symbols so records do not confuse the two.
Changes During the First-Article Build
Program edits, tool substitutions, drawing clarifications, rework, alternate machines, or sub-tier changes during the FAI can make the original planning baseline inaccurate. Log each change with time, affected serial, reason, approval, and characteristics requiring repeat verification.
Minor process tuning within an approved method may not trigger a new FAI, but it still belongs in the production record. A design or process change covered by the invoked trigger rules requires formal assessment. Do not submit results from different uncontrolled configurations as though they came from one representative process.
At completion, compare the actual traveler, CNC program, fixture, inspection plan, suppliers, and design baseline with what production will use. Resolve differences before approval.
Customer Review and Feedback Closure
Submission is not approval. Track portal status, reviewer questions, rejected fields, requested evidence, and resubmission. Protect the physical product and remaining lot while the contractually required approval is open. Do not interpret portal upload success as technical acceptance.
When a reviewer finds a gap, correct the source record and every dependent field. If an omitted balloon reveals an uninspected characteristic, inspect it on the representative article if still possible; otherwise follow the approved recovery process. Never enter a plausible value after the fact.
Close comments with dated responses and retain the final approved version. Lessons should update templates and checklists for later FAIRs without copying part-specific results.
Retention and Retrieval
FAIR retention follows contract, quality-system, regulatory, and customer requirements. Preserve forms, ballooned design, attached reports, certificates, nonconformance or deviation references, approvals, and revision history in a readable format. Index records by part, revision, FAIR number, serial or lot, order, and date.
Digital signatures, links, and portal exports need migration and access planning. If a linked certificate can disappear from a sub-tier portal, archive the permitted controlled copy. Limit edits after approval and log superseded versions rather than deleting them.
Retrieval should support a later partial FAI: the reviewer needs the last approved baseline, its configuration, and the characteristics previously accepted. Test retrieval during internal audits instead of discovering missing attachments years later.
Partial-FAI Impact Assessment
For a proposed change, list direct and indirect effects. A new hole diameter directly changes one characteristic, but it may also change tool access, burr risk, inspection gage, coating mask, or material between features. Machine transfer can affect every characteristic tied to work envelope, spindle, fixture, probing, and environmental capability.
Document why each unaffected characteristic remains valid. Reference the prior FAIR and report new results only for the defined delta plus any characteristics needed to validate interaction. If impact cannot be bounded confidently, perform a full FAI.
The assessment should be approved before the changed production run. Retrospective scope decisions invite missing evidence and customer rejection.
Retain the signed assessment with the submission.
FAIR Review Table
| Review area | Evidence | Key question |
|---|---|---|
| Configuration | Form 1, drawing/model, traveler | Is the exact baseline identified? |
| Material | Form 2, MTR, stock trace | Does evidence belong to this article? |
| Special process | Form 2, certificate, approval | Was the correct approved process used? |
| Characteristics | Balloon and Form 3 | Is every requirement accounted for? |
| Results | CMM/manual/test reports | Are actual values and units clear? |
| Nonconformance | NCR/deviation | Is disposition authorized and bounded? |
| Approval | Internal/customer status | Is the package complete and accepted? |
Use independent review for high-risk or unfamiliar packages.
Cost and Lead Time
FAI cost includes planning, ballooning, method development, programming, fixtures, full inspection, certificate collection, form completion, review, corrections, submission, and possible source inspection. Complex parts can take longer to document than to machine.
Quote FAI separately from recurring inspection. State whether the customer requires approval before the remaining lot proceeds. That hold point can affect machine and material schedule.
What the Buyer Should Provide
Provide the purchase order, part and revision, complete drawing and model data set, referenced specifications, customer clauses, required AS9102 revision, forms or portal, source-approval requirements, serial/lot rules, and approval timing. Identify whether a full or partial FAI is expected, while allowing the supplier to raise trigger questions.
Resolve contradictory requirements through the authorized design or quality channel, not informal email alone.
Questions for the CNC Supplier
- Who owns FAI planning and independent review?
- Which item and production route will produce the article?
- How will model-based requirements and notes be ballooned?
- Which methods and fixtures verify difficult characteristics?
- How are material and special-process records linked?
- What is the plan for lower-level FAIRs and assembly features?
- How are changes screened for full or partial FAI?
- What happens when a result is nonconforming?
- Which digital format or portal is included?
- Is customer approval a shipment or production hold point?
Release Checklist
- Confirm contract, AS9102 revision, customer additions, and forms.
- Freeze drawing, model, specification, and purchase-order baselines.
- Select a representative production article and preserve identity.
- Account for every drawing, model, note, and title-block characteristic.
- Complete Forms 1, 2, and 3 consistently.
- Link material, process, and test evidence to the article.
- Report actual results with units and all occurrences where required.
- Use correct datums, modifiers, and qualified inspection methods.
- Reference but do not hide nonconformances and deviations.
- Document full/partial reason, scope, and prior baseline.
- Perform an internal completeness and configuration review.
- Retain the approved package and trigger reassessment after change.
The Practical FAI Decision
A useful FAIR makes the production baseline auditable: what was made, from which material, by which controlled processes, to which design, with what measured results, and with what approval status. Forms are the structure; configuration discipline and objective evidence create the value.
Before submission, reconcile every balloon number against Form 3 and verify that referenced certificates identify the same part, revision, lot, process, and article. A second-person review should also confirm that multiple occurrences are addressed and that any deviation remains visible rather than being buried in an attachment.
Plan the package before cutting so certificates, methods, and hold points do not become late surprises. For an FAI-ready machining review, send the complete design data set, order requirements, quantities, and required submission format through Request a Quote.